View Single Post
  #1 (permalink)  
Old September 28th, 2004, 11:41 PM
andres_pm andres_pm is offline
Registered User
 
Join Date: Sep 2004
Location: , , .
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
Default How to calculate the work days beetwen two dates.

Hi,

I need to calculate the difference beetwen two dates, without the weekend (Saturday and Sunday) to display only the "Work" days.

For example:

Date 1: 29/09/2004
Date 2: 05/10/2004
Work days: 5 days

Anybody knows how to do this?

Thanks.

Reply With Quote