View Single Post
  #4 (permalink)  
Old October 21st, 2003, 11:00 AM
sal sal is offline
Friend of Wrox
 
Join Date: Oct 2003
Location: Clarksville, TN, USA.
Posts: 702
Thanks: 0
Thanked 0 Times in 0 Posts
Default

A DTS package can be schedule from a job in SQL Server and it can be configured to run on a daily, hourly, weekly basis. It can be saved on the server or it can be saved as a visual basic file.
If you have rights to create one in SQL Server, create one and have an administrator for the Database Server schedule a job to do this for you on a daily basis. The admin may even create the package for you.








Sal
Reply With Quote