Drawing on report according to function
I need to build a line chart with time in x that shows two variables that I get using parameters. The problem is I have to draw two lines, based in a function, to see how much the passed values differ from the "appropriate" variation. Can anyone push me in the direction on what I have to do?
Thank you.
|